When Marina Bay Sands opened in 2010, the concave roof was lit with fluorescent lighting, in 2013 MBS approached CLA's Singapore office, asking them to propose a LED solution to light the roof coves. Due to the limited installation space, CLA proposed a flexible LED pixel solution.
Ptarmigan designed, installed and commissioned a large network and control system that bridged the three buildings and linked the approximately 1000 network devices required to drive over 5km of pixel mapped LED.